Operation, maintenance and servicing of a combined air-handling unit (AHU) for a clean room.
Operating procedure
1. Before start-up, check that the switchgear supply is normal and the inverter settings are correct. Check that the chilled and hot water pipes flow freely and show no leaks at pipes or valves. Confirm every air damper is in the right position, and that the fan belts are intact.
2. Before starting the unit, remove dust and debris from the AHU and ducts, then fit the filters after the system has been blown clean.
3. Press the fan start button; the indicator lights and the unit runs. Set the fan frequency to 50 Hz, then open the supply fan.
4. Carry out formaldehyde and ozone treatment of the whole clean area and the duct system as the process requires. During that treatment close the fresh-air and exhaust openings and open the return opening.
5. Set temperature and humidity by zone: class 100,000 zones at 18-26°C and 45-65% RH; class 10,000 zones at 20-24°C and 45-60% RH.
6. The unit uses chilled water (5-7°C) for cooling and hot water (60°C) for heating; the water should be softened.
7. When adjusting airflow cannot reach the set temperature and humidity, treat the air with saturated steam and chilled water. Keep steam pressure below 0.15 MPa and chilled-water temperature between 7 and 13°C; coil pressure must not exceed 0.5 MPa.
8. Water velocity in the coil should be set to 0.6-1.8 m/s; coil pressure must not exceed 1.2 MPa.
9. When the unit runs with the duct unloaded, block about three-quarters of the outlet so the motor is not burnt out.
10. Use the fresh-air damper opening to adjust zone temperature and humidity with the season. More summer airflow raises indoor temperature and humidity; more winter airflow lowers them. The fresh-air valve must open at least 30%.
11. In winter, start the water pump first, then open the fresh-air valve; on stop, close the fresh-air valve first, then the pump. For a short or long winter shutdown, close the fresh-air valve first; for a long shutdown, drain the coil so it does not freeze and crack.
12. Operators log temperature, humidity and related data every two hours, and watch for abnormal current or voltage. During running, listen for odd motor or bearing noise and overheating.
13. At end of shift, stop the exhaust motor first and set the main fan to 30 Hz; only after the fan runs normally, stop the chiller and steam.
14. On stop, close water or steam first, let the fan run for over ten minutes, then close the return and supply system, and finally the exhaust system.